This 960m long centre pivot irrigation system pump required new underground mains, CT meter and switchboard.  Specialised motor starting was also required for the pumps.

This 960m long centre pivot irrigation system pump required new underground mains, CT meter and switchboard.  Specialised motor starting was also required for the pumps.

Previous Post

Underground power

Next Post

100kw Commercial Solar System